Then I discovered empty plumbing boxes tossed into my garage but "Top-out" is not unique to plumbing; at least iron workers use it as well. Doing my first draw Inspection, I know that Plumbing Top out is for the framing stage, but I am looking for a definitive level of work completed to. Plumbing Top Out. Plumbing Top Out Inspection Checklist. This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.

top off is installing the piping above the floor, after the rough in is done under it. Top-out referrs to the plumbing installed after groundwork and before finish. What does "top out" mean as part as the 3 phases to Plumbing a home? The ruff-in is the underfloor portion, the top out is everything that is above the floor. Plumbing top-out is the stage of plumbing that occurs when a home is in its frame stage. There are three stages of plumbing typically in construction.

Once the house is framed up, it's time for the trades to come in and run everything in the walls. To be prepared, there are a few things that should be on-site for. The plumber will come back now, and top out. This means they will run all the piping in the walls prior to sheet rock, or wall covering. I have included a picture of.